At present, the central air-conditioning installation in hotels has become an irreplaceable project in modern hotels. Shanghai air-conditioning design thinks that it can not only bring fresh air, a comfortable environment, but also improve the beauty of the decoration.
If the central air conditioner is installed well, it can make the user more comfortable in the process of using it, and it can also increase the service life of the air conditioner. But we often overlook some details in the central air-conditioning installation in the hotel. Now we have to analyze the six details that need to be paid attention to:
Holes for interior and exterior walls
Before drilling holes, obtain the consent of the property to avoid damage to the wall structure.
Drill holes on the inner wall to confirm the position of the hole in the room. For example, pay attention to the hole as close as possible to the middle of the room beam, usually on both sides of the beam; the outer wall is perforated, confirm the hole position, should be inclined to the outer wall side, Prevent rainwater from backlogging.
Pay attention to the installation of dustproof inside machine
Indoor unit or fan coil protection: the indoor unit or fan coil is hoisted and protected from dust in time by plastic bags, cardboard and other materials to prevent dust and foreign objects from entering the machine.
The influence of installing the light trough in the internal machine
Due to the physical properties of the air, the hot air flow in winter always keeps rising. Therefore, it is important to maintain sufficient wind speed and adjust the angle of the blinds to ensure that the hot air reaches the height of movement of the personnel.
Once the lamp trough is encountered, the airflow cannot flow downwards, and the hot air always stays in the upper room, causing poor heat dissipation. Therefore, when heat is needed, do not insert the air outlet into the ceiling.
Heat dissipation and maintenance requirements of outdoor units
The distance between the return air side of the outdoor unit and the wall should be at least 200mm;
The outdoor unit should ensure enough space for heat dissipation.
The outdoor unit needs to be installed with buffer drainage
The outdoor unit needs to be installed horizontally, and the base or bracket has sufficient load-bearing capacity.
The base is made of rubber damping pads and bolted firmly.
The drainage of the outdoor unit should be considered to avoid the impact of defrosting water on users downstairs.
Indoor drainage
Before installing the condensing pipe, determine its direction and elevation to ensure that the slope is straight and straight.
The slope of the condensing pipe should be more than 5 parts per thousand, and the slope of the drain outlet of the indoor unit for natural drainage should not be less than 1%.
Fix the condenser tube at 300mm at both ends of the corner.
The above content is compiled and released by Shanghai Decoration Design Company. If you have any questions, please contact us for consultation.
Contact: Qian Lisheng
Mobile phone: 13761167936
Telephone: 021-61637237
Mailbox: zbhqls@163.com
Address: No. 27, Lane 5288, Hunan Road, Hangtou Town, Pudong New Area, Shanghai